Oil and Gas Firm Taps Optiv for Rapid Pipeline Security Build

January 26, 2023

An oil and gas firm needed to secure a thousand-mile-long pipeline, but partway through the project, the Transportation Security Administration (TSA) tightened regulations. Download this case study to learn how Optiv helped.